Switch to the Full Site
Building a Pegram truss bridge
Clinician:
Modeling an HO scale 216' railroad bridge with abutments based on a Pegram Truss design using CAD drawings, Central Valley bridge parts, and scratchbuilt styrene and brass components. In progress photos will be presented as the construction steps are discussed.
Format:
lecture
Topics:
Tuesday | 4:00 PM to 5:00 PM | Three Sisters |
Wednesday | 9:30 AM to 10:30 AM | Three Sisters |