Switch to the Full Site
Signaling your layout with DCC for control/operations
Clinician:
A discussion of the fundamental processes and steps necessary to design and build/install a successful layout railroad signaling system - basic to advanced.
Presentation will include the methods and hardware variations (options) needed to install and operate various prototype signaling systems. Included will be our experience and lessons learned having done/assisted/advised on several layouts in the Pacific Northwest and west coast. Time will be allotted for questions and answers during and following the presentation.
Format:
lecture
Wednesday | 1:00 PM to 2:00 PM | Sellwood |
Saturday | 11:00 AM to 12:00 PM | Mt. Bachelor |